Terry, Andy, Noel and Kent enjoyed breakfast at Al's Diner at 0700, a popular place on Saturday morning. Work today included further airbox assembly, stripping old paint from some fairings and the start of seat fabrication.
The next work sessions are tentatively planned for Friday, October 5th from 4-8 PM.
|
Andy attached most of the cowl and nose bowl in order to determine how best to install the airbox. |
|
Andy working on the airbox. |
|
Upper air box cover as it mounts to lower face of the carburetor. |
|
Terry measures length of hinge needed to attach set bottom to seat back. |
|
First seat with hinge in place. |
No comments:
Post a Comment